3.29 階層式分解hierarchical decomposition

process of dividing a project (3.61) or programme (3.54) scope into successively smaller work breakdown structure elements (3.98).

將專案(3.61)或專案群(3.54)範圍劃分為逐步縮小的工作分解結構元素(3.98

3.30 整合後基線審查integrated baseline review

assessment to establish a common understanding of the performance measurement baseline (3.44) for verification of the technical content of a project (3.61) or programme (3.54).

通過評鑑對績效度量基線(3.44)達成共識,以查證專案(3.61)或專案群(3.54)的技術內容。

3.31 問題issue

event that arises during a project (3.61) or programme (3.54) requiring resolution for the project or programme to proceed.

專案(3.61)或專案群(3.54)期間發生的事件,需要將之解決,使專案或專案群能夠繼續進行。

3.32 問題登錄簿issue register

document to record issues (3.31), responses and other relevant issue information

文件化記錄問題(3.31)、回應及其它相關問題的資訊。

3.33 主導 lead

attribute applied to a logical relationship to advance the start or end of an activity (3.2).

應用於邏輯關係以推進活動(3.2)的開始或結束的屬性。

3.34 經驗教訓 lessons learned

knowledge gained throughout a project (3.61), programme (3.54) or portfolio (3.46) that shows how events were addressed or should be addressed for the purpose of improving future performance.

在專案(3.61)、專案群(3.54)或專案組合(3.46)中獲得的知識,顯示事件如何獲得處理或須加以處理以提升未來績效。

3.35 管理資訊系統management information system

hardware and software used to support the compilation of information, analysis and reporting of project (3.61) and programme (3.54) metrics.

用於支援彙編各項資訊、分析與報告關於專案(3.61)與專案群(3.54)指標的硬體與軟體。

3.36 管理儲備management reserve

amount of budget external to a performance measurement baseline (3.44), withheld for management control (3.13) in response to unforeseen events or activities that are a part of the scope.

績效衡量基線(3.44)之外的預算金額,因應不可預見的事件或活動而保留給管理階層控制(3.13)。

3.37 里程碑milestone

significant planned, or to be planned, point in a project (3.61), programme (3.54) or portfolio (3.46)

專案(3.61)、專案群(3.54)或專案組合(3.46)中的重要規劃節點。

3.38 進度網路(圖)network schedule

graphical representation indicating the logic sequencing and interdependencies of the work elements of a project (3.61) or programme (3.54).

圖形化顯示專案(3.61)或專案群(3.54)工作元素的邏輯順序方式及相互依賴關係。

3.39 機會opportunity

risk (3.76) occurrence that would have a favourable impact.

可能產生正面衝擊的風險事件。

3.40 組織分解結構organizational breakdown structure

decomposition (3.19) of the management team of an organization or of the management team that performs the work of a project (3.61) or programme (3.54)

Note 1 to entry: The organizational breakdown structure can include partners or subcontractors. It is used to illustrate the relationship between project or programme activities and the organizational units that will manage or perform the work activities.

組織的管理團隊或管理團隊的分解以執行專案(3.61)或專案群(3.54)工作。

1:組織結構可包含合作夥伴或分包商。係用以說明專案或專案群活動與負責管理或執行工作活動的組織單位之間的關係。

3.41 成果outcome

change resulting from the use of the output (3.42) from a project (3.61) or programme (3.54).

使用專案(3.61)或專案群(3.54)產出(3.42)所出現的變化。

3.42 產出output

aggregated tangible or intangible deliverables (3.20) that form the project (3.61) or programme (3.54) result.

構成專案(3.61)或專案群(3.54)結果的總合式有形或無形交付物(3.20)。

3.43 父元素parent element

work that is decomposed into two or more lower-level elements of work

將工作分解為兩個或多個較低階的工作元素。

3.44 績效量測基線performance measurement baseline

total time-phased scope of work and budget plan against which project (3.61) or programme (3.54) performance is measured, not including management reserve (3.36).

全部時間範圍內分階段的工作和預算計畫,可用於測量專案(3.61)或專案群(3.54)的績效,不包括管理儲備(3.36)

3.45 規劃價值planned value

工作進度的預算成本budgeted cost of work scheduled

time-phased budget (3.91) authorized for the work scheduled.

已批准的工作進度的分階段預算(3.91)

3.46 組合portfolio

collection of portfolio components (3.47) grouped together to facilitate their management to meet strategic objectives.

為促進管理以實現策略目標而專案組合元件(3.47聚集在一起的集合。

3.47 組合元件portfolio component

project (3.61), programme (3.54), portfolio (3.46) or other related work.

專案(3.61)、專案群(3.54)、專案組合(3.46)或其他相關工作。

3.48 專案組合管理portfolio management

coordinated activities to direct and control (3.13) the accomplishment of strategic objectives.

協調活動以指導與控制(3.13)達成策略目標。

3.49 專案組合經理portfolio manager

person appointed with the accountability and responsibility for a portfolio (3.46) to meet strategic objectives.

某個專案組合為達到策略目標,故指派為專案組合的當責及承擔責任的人。

3.50 專案組合計畫portfolio plan

documented description of a portfolio’s (3.46) alignment to strategic objectives and integrated management baselines (3.4).

文件化描述專案組合(3.46)與策略目標及整合管理基線(3.4)的齊一程度。

3.51 預防措施preventive action

<process management> direction and activity (3.2) for modifying the future performance of work to prevent deviations from a plan.

《過程管理》指導與活動(3.2)用於修正未來工作績效,以防止偏離計畫。

Note 1 to entry: Preventive action is taken to prevent occurrence whereas corrective action (3.15, 3.16) is taken to prevent recurrence.

1:預防措施是為了防止發生,而矯正措施(3.153.16)則是為了防止復發。

3.52 預防措施preventive action

<nonconformity treatment> action to eliminate the cause of a potential nonconformity or other potential undesirable situation.

Note 1 to entry: Preventive action is taken to prevent occurrence whereas corrective action (3.15, 3.16) is taken to prevent recurrence.


《不符合處理》消除潛在不符合或其他潛在不期望情況的原因所採取的措施。

註:採取預防措施以防止不符合發生,而採取矯正措施(3.7)以防止不符合再次發生。

3.53 產品分解結構product breakdown structure

decomposition (3.19) of a product into its components.

將產品分解(3.19)為其組成元素。

3.54 專案群programme

group of programme components (3.56) managed in a coordinated way to realize benefits (3.6).

為實現收益(3.6)以協調的方式管理的一組專案群的組成物件(3.56)。

3.55 專案群收益programme benefit

assessable outcome (3.41) viewed as an advantage by programme (3.54)stakeholders (3.86) and contributing to the programme objectives.

可評鑑成果(3.41)被專案群(3.54)利害相關者(3.86)視為優勢,而有益於專案群目標。

3.56 專案群組成物件programme component

project (3.61), programme (3.54) or other related work.

專案(3.61)、專案群(3.54)或其他相關工作。

3.57 專案群管理programme management

coordinated activities to direct and control the realization of identified benefits (3.6) and deliverables (3.20).

協調活動以指導及控制已識別收益(3.6)及交付物(3.20)。

3.58 專案群經理programme manager

person appointed with the accountability and responsibility of a programme (3.54) to realize identified benefits (3.6) and deliverables (3.20).

被任命負責專案群(3.54)的當責者,負責實現已識別的收益(3.6)及交付物(3.20)。

3.59 專案群計畫programme plan

documented description of the integrated technical and management baselines (3.4) to be followed for a programme (3.54).

文件化說明專案群(3.54)中將遵循的整合性技術與管理基線(3.4)。

3.60 進展報告progress report

report of current status and work accomplished during a specified time period.

報告指定期間內的現況及完成的工作進度。

3.61 專案project

temporary endeavour to achieve one or more defined objectives.

實現一個或多個既定目標所付出的臨時性努力。

補充說明:

一個「專案」就是為了達成某個特定目的,在一段有限的時間內,透過有計劃、有組織的付出努力來完成一系列獨特任務的過程。它與日常營運活動的區別在於其「臨時性」和「獨特性」,且需要一群人付出努力而達成專案目標。

3.62 專案保證 project assurance

planned and systematic actions necessary to provide confidence to the sponsoring organization and project sponsor (3.85) that a project (3.61) is likely to achieve its objectives.

Note 1 to entry: It also applies to a programme (3.54).

使發起組織和專案發起人(3.85)相信專案(3.61)有可能實現其目標所採取的有計劃和有系統的必要措施。
註:同樣適用在專案群(3.54)。

參考文件:


ISO 21506:2024

Project, programme and portfolio management — Vocabulary
專案、專案群及專案組合管理 — 術語